top of page

Benjamin Mountain

Project Geologist
B.A., Environmental Geoscience, West Virginia University

Mr. Mountain is a Project Geologist with experience in quality control, soil profiling and analysis, various media sampling and analysis, conceptual groundwater modeling and mapping, and data management. He has a vast amount of project field experience including environmental remediation, technical support, Phase I & II Environmental Site Assessments, CQA field oversight, and drill rig oversight. His computer software proficiencies include Surfer, Strater, Diver Office, Win-Situ 5, ProUCL, and BIOSCREEN.

Experience:

Years Experience/Years with KEY: 5/2

Practice Area(s):

  • Construction Oversight

  • Emerging Contaminants

  • Environmental Due Diligence

  • Geophysics Investigations

  • Groundwater Flow/Contaminant Modeling

  • Oil & Gas Services

  • Site Assessment

  • Site Development

  • Soil & Groundwater Remediation

  • Superfund/RCRA

Specialties

  • Project Management

  • Quality Control

  • Environmental Remediation

  • Technical/Field Support

  • Various Media Sampling/Analysis

  • Phase I &II Environmental Site Assessments

  • CQA Field Oversight

  • Drill Rig Oversight

Brownfields_Closed Lagoon_Plant.jpg

View More

Representative Projects:

Phase II Environmental Site Assessment - PFAS

  • Oversaw soil borings, monitoring well, and piezometer installation 

  • Monitoring wells were developed using a turbidity meter and peristaltic pump

  • Soil and water samples were analyzed for PFAS 

  • Drew groundwater contour maps to address monitoring well and piezometer water level gauging data

Land Development - CQA

  • Conducted construction oversight of electric vehicle charging stations at commercial warehouse including:

    • Trenching and excavation

    • Saw cutting and asphalt removal

    • Backfilling

    • Asphalt installation

  • Responsible for overall Site Management Plan

  • Operated and maintained CAMP air monitoring system

  • Conducted field in-place density tests

Site Remediation

  • Conducted spill response for fluids at well pad

  • Used soil conductivity meter to determine possible spill extends

  • Collected samples for brines within the spill area

bottom of page