top of page
• Investigation
• Remedial Design
• Construction
• OM&M
A client’s 150-acre site was used to manage process-related alkaline slurry in surface impoundments. Although closed, alkaline leachate seeped from the bases of the impoundments. KEY consulted on the design of a leachate collection and treatment system providing cost-saving process improvements. KEY now operates the system remotely in real time via the web.
bottom of page