top of page
• Investigation
• Wetlands Restoration
• Modeling
KEY managed the investigation and removal activities for this former wood treating facility. Cost-saving measures were developed as part of the site investigation methods, by defining a Technical Impracticability Zone for groundwater, performing a landfarming pilot study, and successfully negotiating waivers for post-removal soil sampling.
bottom of page